PDF kerala pwd schedule of rates -ANALYSIS FOR SCHEDULE OF RATES 2009 VOLUME - I - HP PWD - PWD SCHEDULE OF RATES FOR CIVIL WORKS 2014(1).pdf
Wait Loading...


PDF :1 PDF :2 PDF :3 PDF :4 PDF :5 PDF :6 PDF :7 PDF :8


Like and share and download

PWD SCHEDULE OF RATES FOR CIVIL WORKS 2014(1).pdf

ANALYSIS FOR SCHEDULE OF RATES 2009 VOLUME - I - HP PWD

PDF SCHEDULE OF RATES archsd gov hk sor2013 vol2 bldg services works 2013 11 01 pdf PDF SCHEDULE OF RATES archsd gov hk sor2013 vol1 builders works 2013 11 04 pdf

Related PDF

SCHEDULE OF RATES

[PDF] SCHEDULE OF RATES archsd gov hk sor2013 vol2 bldg services works 2013 11 01 pdf
PDF

SCHEDULE OF RATES

[PDF] SCHEDULE OF RATES archsd gov hk sor2013 vol1 builders works 2013 11 04 pdf
PDF

Schedule of Rates - KeralaPWD

[PDF] Schedule of Rates KeralaPWD keralapwd gov in keralapwd eknowledge Upload 1820 pdf
PDF

schedule of rates - PWD

[PDF] schedule of rates PWD arunachalpwd pdf 06092018 SR 2018 Building pdf
PDF

SCHEDULE OF RATES PUBLIC WORKS DEPARTMENT

[PDF] SCHEDULE OF RATES PUBLIC WORKS DEPARTMENT cgmfpfed pdtender pdf Estimates D I pdf
PDF

Schedule of rates 2017-18 - tahdco

[PDF] Schedule of rates 2017 18 tahdcotahdco wp content uploads 2017 12 schedule of rates 2017 18 pdf
PDF

STANDARD SCHEDULE OF RATES

[PDF] STANDARD SCHEDULE OF RATEStnhighways gov in pdf PWD 20SOR 2015 16 pdf
PDF

ANALYSIS FOR SCHEDULE OF RATES 2009 VOLUME - I - HP PWD

[PDF] ANALYSIS FOR SCHEDULE OF RATES 2009 VOLUME I HP PWDhppwd gov in ANALYSIS 20FOR 20SCHEDULE 2009 doc pdf
PDF

PWDT FORM

Untitled - ResearchGate

PDF British Columbia Pharmacy Practice Residency Programs ihpharmacy BC 20Oral 20Assessment 20Guide 202010 pdf PDF English ( pdf ) SciELO scielo br pdf bjps v49n1 a10v49n1 pdf PDF Pharmaceutical Care Issues in Patients with

  1. pharmacist rounding template
  2. pharmacist workup template
  3. pharmacotherapy workup notes example

PWG

win1768; Ply Gem Window Group; Ply Gem 1500 Vinyl Tilt Single

ftp pwg pub pwg ipp wd wd ippauth 20190328 pdf ALL FAULTS, and the authors and developers of this material and the Printer Working Group and its members hereby disclaim all warranties and conditions, either expressed, implied or statutory, including, but not limited to, any (if any) implied

PWHT-Storage-Tanks-Rev-a-1.pdf

Contents - National Board

PDF pwht instruction sheet LANL Engineering Standards engstandards lanl gov esm GWS 201 08 Att 1 R1 pdf PDF Guidelines for pressure vessel safety assessment GovInfo govinfo gov GOVPUB C13 8506a13231b84307c7f3c2f6a91ee412

  1. pwht formula
  2. when is pwht required
  3. pwht procedure pdf
  4. pwht temperature for carbon steel
  5. post weld heat treatment ppt
  6. pwht meaning
  7. api 650 storage tanks
  8. pre and post weld heat treatment pdf

PWM_LPCXpresso

Mbed Kit User Guide - Book Library

PDF Mbed Kit User Guide Book Librarywl2 stage ovdal dk mbed kit user guide pdf

p_wp096

Why Has Japan Failed to Escape from Deflation?

Jun 27, 2017 Abstract Japan has failed to escape from deflation despite extraordinary monetary policy easing over the past four years Monetary easing?

  1. PWP096

Pyar Me Pagal Karne Ka Wazifa PDF Doc

Salawat e Muqaddas or Durood e Muqaddas - yaallahin

yaallah in wp content uploads 2015 11 durood • Pyar Me Pagal Karne ka Wazifa • Har Dua Qabool Hone Ki Dua Juma K Din Ka Wazifa For Hajat • Karz Utarne Ki Dua Qarz Ada Karne Ka Wazifa

Pyburn 2009 Practising Archaeology.pdf

engaging with non-descendant communities in northern belize

PDF Online Journal in Public Archaeology Dialnet dialnet unirioja es descarga articulo 5966066 pdf PDF Understanding Archaeological Authority in a Digital UCL Discoverydiscovery ucl ac uk Understanding 20Archaeological 20Authority 20in 20a 20Di PDF The Politics

depedpines wp content uploads 2013 07 MGA MEKANICS 2 MEKANIKS PARA SA PAGSASALING WIKA a Ang kalahok ay magdadalang lapis at papel na gagamitin b Angpagsasaling wika ay naisulat sa Wikang Ingles at isasalin sa Wikang Filipino c Bibigyan ng teksto

Pyetje & Pergjigje Nga Kriminalistika[1]

Shkarko - Akademia e Drejtësisë

Page 1 Është vështirë të jepet përgjigje e saktë në këtë pyetje Mirëpo është Me një qasje të këtillë përfshihen të gjitha pyetjet kruciale nga kriminalistika Page 1 vendimin nr 17 3748 3 më datën 28 12 2011 nga

  1. Kriminalistika Mjekësore
  2. MARRJA NË PYETJE E TË DYSHUARIT NGA ANA
  3. Page 1
  4. 3 më datën 28.12.2011 nga Këshilli arsimor
  5. pyetje të aktorit të dyshuar
  6. ndërsa metodika kriminalistike i
  7. dhe paaftësia për të gjetur përgjigje efektive rreth rritjes së krimit
  8. TAKTIKA DHE TEKNIKA E PYETJES SË TË PANDEHURIT
  9. gjatë kontrollit dhe përpunimit kriminalistik
  10. të jepet përgjigje në pyetjet e arta të krim
Home back415416417418 419420 Next

EDULE OF RATES FOR CIVIL WORKS 2014(1)

Description

PWD SoR 2014 for Civil Works

SCHEDULE OF RATES FOR CIVIL WORKS

PWD SoR 2014 for Civil Works

SCHEDULE OF RATES FOR CIVIL WORKS FOURTEENTH EDITION: 2013 Item No

Description of Item

Unit Rate

Unit Rate

DIVISION 01 : GENERAL AND SITE FACILITIES Item No

Description of Item Erection and maintenance of site office and removal the same after completion of work in accordance with the conditions of contract

In addition to the office required for his own use,

the Contractor shall provide and maintain furnished field office for the use of the Engineer and his staff

The field office is to have a concrete floor,

false ceiling of hard board with seasoned Garjan wood frame and painted,

and all windows are to be glazed and provided with steel grill

Outside and inside wall surface are to be painted on plaster acceptable to the Engineer

The field office shall be maintained in a secure and watertight condition by the Contractor until the completion of the contract and shall be provided with electricity,

All doors shall be fitted with approved locks and windows shall be provided with screen/blinds

Before construction the Contractor shall submit plans and drawings showing proposed details and location for the field office,

layout of electrical and water supply and hard standings thereto for the approval of the engineer

The Engineer may require revision of the plans prior to giving approval for construction

The Contractor shall also submit details proposed furniture,

fittings and other items of equipment and plant to the engineer for approval

These items shall be of the standard quality suitable for site

The office,

access roads and hard standings shall be ready for occupation by the Engineer within 28 days of the date when the Contractor first occupies the site

The Contractor will provide day and night guards and a tea boy for the field office

At the end of the project all materials,

fittings recovered from dismantling the office and removing access road will be the property of the Contractor

No interim payment shall be certified unless Engineer‟s office with required facilities are constructed and accepted by the Engineer

Proportionate payment for this item shall be made distributing in each bill on the basis of percentage progress of the whole works under contract)

Engineer‟s site office of minimum 15 sqm plinth area with providing furniture,

125,251

Engineer‟s site office of minimum 38 sqm plinth area with providing security fencing,

389,014

Engineer‟s site office of minimum 38 sqm plinth area with providing security fencing,

IBM compatible PC with monitor,

uninterruptible power supply (UPS),

Laserjet printer (minimum 25 ppm),

502,145

Engineer‟s site office of minimum 38 sqm plinth area with providing security fencing,

IBM compatible PC with monitor,

uninterruptible power supply (UPS),

Laserjet printer (minimum 25 ppm),

Freeze,

534,467

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Engineer‟s site office of minimum 10 sqm plinth area with providing furniture,

stationeries etc for low value simple work of short duration (not more than six months)

Providing and maintenance window type 1800 BTU AC (Air-Cooler) for Engineer‟s office and remove after completion of contract

Providing and maintenance one project profile signboards of the size not exceeding 1 m x 2 m,

to be placed at a suitable place of the site including submission of proposals for the materials of the signboards and text layout to the Engineer for approval which will be positioned as directed by the Engineer and removing the same on completion of the Works or as instructed by the Engineer

Providing 3 sets as-built Drawings subject to Engineer‟s approval produced in AutoCAD software in 23

38” x 16

and operating and maintenance manual of the equipment and plant incorporated in the works,

in original by the date stated in the Particular Conditions of Contract (PCC)

If the Contractor does not supply the as-built drawings and operating and maintenance manuals by the date stated in the Particular Conditions of Contract (PCC),

or they do not receive the Engineer‟s approval,

the Engineer shall withhold the amount stated in the PCC from the payments due to the Contractor

Per tender

The as-built drawings must show the permanent works as actually constructed and reflect the revision of Tender Drawings and Drawings supplied to the Contractor during the Contract as well as revisions of drawings supplied by the Contractor during the Contract

(One set of as-built drawings shall be considered for measurement and payment) 01

Providing additional copy of as-built drawing produced in AutoCAD software in 23

38" x 16

Providing minimum ten (10) copies coloured post-card size progress photograph of „works under contract‟ taken by professional photographer which record the progress of the Works

Preparation & submission of implementation schedule to the Engineer for approval prior ground breaking showing the events (works) and successive sub-events of works including all the management & control parameters like Earliest Start Time (EST),

Earliest Finish Time (EFT),

float events on critical path,

with description of general method of works,

in orderly manner all in the form network diagram prepared in computer software like MS project and presenting in Displayable hard and soft copy minimum 3 (three) sets

Proportionate payment for this item shall be made distributing in each bill on the basis of percentage progress of the whole works under contract)

Per tender

Updating the Implementation Schedule and submission to the Engineer at intervals no longer than 28 days showing actual physical and financial progress achieved,

on each activity and the effect of the progress on the timing of the remaining work,

including any changes to the sequence of the activities

However,

Engineer‟s approval of the Programme shall not alter the Contractor‟s obligations

The Contractor may revise the Programme and submit it to the Engineer again at any time

A revised programme shall show the Variations and Events related to change of contract price

Month wise documentation shall be the basis of payments on this item

PWD SoR 2014 for Civil Works

Item No

Description of Item

Providing all necessary logistic support to frame ‘monthly progress meeting’ between Contractor/Contractor‟s representatives and Employer / Employer‟s representatives at the Engineer's office at site

Month wise documentation shall be the basis of payments on this item

Providing layout and carry over PWD Bench-Mark (BM) at site from nearby BM pillar,

Property lines,

setting and marking all pillars,

showing and maintaining reduced levels (RL‟s) including locating,

protecting all public utilities within the premise of work and finally all to be presented in black and white

Mobilization and cleaning site before commencing actual physical work and during contract period and demobilization after completion of the Works under contract accepted by Engineer

This work shall also covers clayey cleaning and clearing,

dressing the project area on and in the ground to an extent that all the events of works of the project can be executed smoothly in a working environment with a particular attention on safety and security in all respects,

and to stockpile the end outcome to a place for disposal agreed by the Engineer,

payments are to be based on ground area determined by the Engineer and be proportionate to the percentage progress of work under contract as a whole in all respects and approved by the Engineer

Providing Expertised architect having relevant experience (s) more than 5years for detail documentation of architectural themes,

communication with theme architect & getting approval ,

specifying architectural needs according to approved master architectural themes & plan,

certifying as built drawing for the approval etc & jobs assigned by the HOPE or his official at site (max man month not greater than 1/4th of Project duration & payment for the item subject to submission of CV & approved by approving authority)

Per month

Providing Expertised Engneer having relevant experience(s) more than 10years,

for the project documentation,

preparation of project Material schedule and Testing schdule for approval etc

& jobs assigned by the HOPE or his official,

at site (max man month not greater than 1/4th of Project duration & payment for the item subject to submission of CV & approved by approving authority)

Per month

100,000

work samples & emmergency services etc

(total usage not more than 1/6th of project duration

Per month

END OF DIVISION ONE …………………

Unit Rate

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Unit Rate

DIVISION 02 : EXCAVATION,

FILLING AND SITE DEVELOPMENT & PALISADING Item No

Description of Item

Earth work in excavation in all kinds of soil for foundation trenches including

ramming and preparing the base,

fixing bamboo spikes and marking layout with chalk powder,

providing necessary tools and plants,

protecting and maintaining the trench dry etc

cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc

all complete and accepted by the Engineer,

subject to submit method statement of carrying out excavation work to the Engineer for approval

However,

Engineer‟s approval shall not relieve the contractor of his responsibilities and obligations under the contract

Layout and marking for earthwork in excavation in foundation accepted by the Engineer

[Plinth area of the structure shall be considered for measurement]

Earthwork in excavation in foundation trenches up to 1

Earthwork in excavation in foundation trenches up to 1

Earthwork in excavation in foundation trenches up to 1

Earthwork in excavation in foundation trenches up to 1

Extra rate for each additional 0

5 meter

Extra rate for each 1 m additional lead beyond 10 m

Bailing out trapped water caused by inundation due to sepage or rain,

where correct documentation on rain fall,

volume of inandation shall strictly be made

Supplying of straight and strong borrak bamboo posts of having minimum 75 mm diameter althrough and driving the same vertically in the ground up to required depth by any means shaping the top of the post,

all complete and accepted by the Engineer

Supplying wooden ballah having an average diameter not less than 150 mm (without barks) at one third distance from larger end with a minimum end diameter of 100 mm for retaining purpose and driving to a depth as per design and drawing by any method including all arrangement for staging,

complete and accepted by the Engineer

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Palisading work by supplying bitumen drum sheet walling tied with 20 BWG G

wire fixing the same with already driven borrak bamboo posts with half split borrak bamboo runners @ 450mm c/c horizontally with iron nails,

I wire etc

all complete and accepted by the Engineer

(Rate is excluding the cost of bamboo post)

Supplying and fitting-fixing horizontal bracing in Palisading with ½ split wooden ballah having an average diameter not less than 150 mm with a minimum end diameter of 100 mm @ 450 mm including supply of iron nails,

complete approved and accepted by the Engineer

Shore protection work during excavation in foundation trenches up to 1

5 m depth,

to protect loss due to damage of property by Palisading accepted by the Engineer

[the rate is including cost of vertical post]

Shore protection work during excavation in foundation trenches to protect loss due to damage of property by Palisading beyond 1

Supply and laying 2 mm thick Geo-textile of approved quality and origin/manufacturer as per manufacturer‟s instructions approved and accepted by the Engineer

Before commencing lying of Geo-textile,

the Contractor must submit the method statement for carrying out this work including sample with evidence of origin and compliance certificate from independent testing laboratory for approval

Removing sludge or semi-liquid clay/substances etc not suitable for pumping out or carrying by head load from the bottom of any marshy land,

pond by mixing fine local sand of F

complete and accepted by the Engineer subject to submit method statement to the Engineer for carrying out the works including ultimate disposal of the sludge under this item for approval

However Engineer‟s approval shall not relieve the Contractor of his responsibilities and obligations under the contract

Sand filling in foundation trenches and plinth with sand having F

watering and compaction to achieve minimum dry density of 90% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only etc

all complete and accepted by the Engineer

Sand filling in foundation trenches and plinth with coarse sand having min

watering and compaction to achieve minimum dry density of 90% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only etc

all complete and accepted by the Engineer

Sand filling in foundation trenches and plinth with coarse sand having min

watering and compaction to achieve minimum dry density of 90% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only etc

all complete and accepted by the Engineer

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

all complete and accepted by the Engineer

all complete and accepted by the Engineer

Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site to achive minimum dry density of 90% with optimum moisture content (Modified proctor test) including carrying watering,

dressing and compacting to a specified percentage each layer up to finished level etc

all complete and accepted by the Engineer

Clearing and disposing of excavated earth from the construction site by truck or any other means to a place within 30 km radius of the city or town area including loading,

leveling and dressing the carried earth etc

complete accepted by the Engineer

Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or any other means loading and unloading at both ends including leveling,

watering and compacting to achive minimum dry density of 90% with optimum moisture content (modified proctor test) including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc

all complete and accepted by the Engineer

For Dhaka Metropolitan Area

For Chittagong / Sylhet/ Narayanganj Area

For Rajshahi / Barishal / Khulna metropolitan area

For other than Dhaka,

Sylhet,

Rajshahi,

Barishal,

Khulna metropolitan area and N'ganj district

Site Development/Improvement by carted earth or dredged sand,

sandy silt (free from any organic,

environmental hazardous substances) carried by head or truck or any other meansl in/c cost of cutting or by dredging of sand,

sandy silt in the designated area,

levelling and dressing in layers up to finished level etc

all complete as per direction and accepted by the engineer in charge

For Dhaka Metropolitan Area

By Other than dredgeing

By Dredging including necessary systems there off

For Chittagong / Sylhet/ Narayanganj Area

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

By Other than dredgeing

By Dredging

For Rajshahi / Barishal / Khulna metropolitan area

By Other than dredgeing

By Dredging

For other than Dhaka,

Sylhet,

Rajshahi,

Barishal,

Khulna metropolitan area and N'ganj district

By Other than dredgeing

By Dredging

Mechanical compaction of earth beyond plinth area,

required for pre-approved specific engineering purpose in 150mm layers including leveling,

watering and consolidation each layer with chain dozer,

to achieve minimum dry density of 90% with optimum moisture content (modified proctor test) up to finished level all complete and accepted by the engineer subject to submission of the method statement

END OF DIVISION TWO …………………

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Description of Item

Unit Rate

One layer of brick flat soling in foundation or in floor with first class or picked jhama bricks including preparation of bed and filling the interstices with local sand,

complete and accepted by the Engineer

One layer of Herring bone bond (HBB) brick soling in foundation or in floor with first class or picked jhama bricks including preparation of bed and filling the interstices with local sand,

leveling including the supply of water,other charges,

all complete and accepted by the Engineer

Brick on end edging including preparation of bed and filling the interstices with local sand,

maintaining alignment grid etc

all complete and accepted by the Engineer

Mass concrete (1:3:6) in foundation or floor with cement,

compacting to levels and curing for at least 7 days including the supply of water,

electricity and other charges and costs of tools and plants etc

all complete and accepted by the Engineer

Mass concrete in foundation (1:3:6) with cement,

Mass concrete in floor (1:3:6) with cement brick chips and sand of F

Mass concrete (1:2:4) in foundation or floor with cement,

compacting to levels and curing for at least 7 days including the supply of water,

electricity and other charges and costs of tools and plants etc

all complete and accepted by the Engineer

Mass concrete in foundation (1:2:4) with brick chips and local sand of F

Mass concrete in floor (1:2:4) with brick chips and local sand of F

Damp proof course (DPC) (1:1

curing and finished with a coat of bitumen including the supply of water,

electricity and other charges and costs of tools and plants etc

all complete and accepted by the Engineer

Supplying and laying of single layer polythene sheet weighing one kilogram per 6

DIVISION 03 : BRICK SOLING,

DPC ETC

Item No

END OF DIVISION THREE …………………

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

DIVISION 04 : BRICK WORKS,

PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORK Item No

Description of Item

Unit Rate

Brick works with first class bricks in cement sand (F

filling the joints/interstices fully with mortar,

cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc

all complete including cost of water,

electricity and other charges and accepted by the Engineer

Brick works of width one brick or one and a half brick length with first class bricks in cement sand (F

filling the interstices with mortar,

cleaning and soaking the bricks at least for 24 hours before use and washing of sand,

curing at least for 7 days etc

all complete (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) and accepted by the Engineer

(Cement: CEM-II/A-M)In ground floor

Brick works with first class bricks in cement sand (F

cleaning and socking the bricks at least for 24 hours before use and washing of sand,

curing at least for 7 days etc

all complete including cost of water,

electricity and other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) accepted by the Engineer

In ground floor

Exposed brick works (for exterior wall without outside plaster) with special quality sorted out first class bricks,

very carefully laid in cement sand (F

true to vertical and horizontal lines including raking out joints scaffolding,

soaking the bricks at least for 24 hours before use,

Curing at least for 7 days and high class flush pointing with cement sand (F

electricity and other charges etc all complete and accepted by the Engineer

In ground floor

Exposed brick works (for exterior wall without outside plaster) with automatic machine made first class bricks,

very carefully laid in cement sand (F

true to vertical and horizontal lines including raking out joints scaffolding,

soaking the bricks at least for 24 hours before use,

Curing at least for 7 days and high class flush pointing with cement sand (F

electricity and other charges etc all complete and accepted by the Engineer

In ground floor

Brick works with 10 holes machine made bricks of approved size (9

true to vertical and horizontal lines including raking out joints,

filling the interstices with mortar,

cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand,

curing at least for 7 days and pointing with cement sand (F

electricity and other charges etc

complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Brick work with 9

true to vertical and horizontal lines including raking out joints,

filling the interstices with mortar,

cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand,

curing at least for 7 days and pointing with cement sand (F

electricity and other charges etc

complete and accepted by the Engineer

(Cement: CEM-II/A-M)In ground floor

Brick works with 9

true to vertical and horizontal lines including raking out joints,

filling the interstices with mortar,

cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand,

curing at least for 7 days and pointing with cement sand (F

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

Brick works with 9

true to vertical and horizontal lines including raking out joints,

filling the interstices with mortar,

cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand,

curing at least for 7 days and pointing with cement sand (F

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

Extra cost shall be incorporated in the estimate for each additional floor for brick works (item No

Add for each additional floor up to 5th floor

Add for each additional floor from 6th floor to 9th floor

Add for each additional floor for 10th floor and above

Extra cost for brick-work for each additional meter (or part of meter) free height of brick wall beyond 4 m from the respective floor in auditorium,

electricity and other charges etc

all complete and accepted by the Engineer

(Extra cost shall be incorporated in the estimate only when both sides of wall is uninterruptedly free beyond 4

00 meter)

Providing brick works for 200 x 100 mm facing in superstructure with 200 x 100 x 50 mm machine made klinker hard pressed facing bricks of approved quality in cement sand (F

cutting the bricks to required size wherever necessary including high class recessed pointing,

cleaning and soaking the bricks at least for 24 hours before use and washing and screening of sand,

curing at least for 7 days for all floors up to 4th floor including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEMII/A-M)In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Providing brick works in facing for 200 x 50 mm in superstructure with 200 x 50 x 50 mm machine made hard pressed klinker facing red or Maroon strips of approved quality pressed with 20 mm thick cement sand (F

cleaning and soaking the bricks for at least 24 hours before use and washing of sand necessary scaffolding,

curing at least for 7 days for all floors up to 4th floor including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

In ground floor

Providing brick works for 200 x 62 mm facing in superstructure with 200 x 62 x 16

cutting the bricks to required sizes wherever necessary with high class recessed pointing,

cleaning and soaking the bricks at least for 24 hours before use washing and screening of sand and necessary scaffoldings,

curing at least 7 days including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/AM) In ground floor

cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/AM) In ground floor

Exposed 125 mm thick pointing extra ordinary ornamental brick work with sorted out first class bricks in cement sand (F

cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M)In ground floor

Exposed 125 mm thick pointing extra ordinary ornamental brick work with automatic machine made first class bricks in cement sand (F

cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/AM) In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Providing 125 mm thick (Partition walls) brick work in superstructure brick work (1:4) in cement sand (F

carefully laid in cement mortar and depth joints true to vertical and horizontal lines including

filling the interstices with same mortar,

making bond with connected walls,

soaking brick at least 24 hours and washing of sand,

electricity and other charges accepted by the Engineer

(Cement: CEM-II/AM) In ground floor

Fancy screen work with different size hollow machine made design blocks with uniform colour,

carefully laid in coloured cement sand (F

true to vertical and horizontal line including racking out joints,

cleaning and soaking the blocks for minimum 24 hours before use including washing and screening of sand,

complete in all respect including supply of all necessary materials including cost of water,

electricity and other charges accepted by the Engineer

With design block No

With design block No

With design block No

Extra cost shall be incorporated in the estimate for each additional floor for brick and screen block works (item No

12 to 4

Add for each additional floor up to 5th floor

Add for each additional floor from 6th floor to 9th floor

Add for each additional floor for 10th floor and above

Klinker paving brick works in floor or pavement with machine made pressed bricks of approved quality in cement sand (F

cutting the bricks to required size soaking the same 24 hours before use wherever necessary including high class flush pointing in cement mortar (1:2),

curing at least for 7 days etc

including washing and screening of sand,

electricity and other charges complete and standard practice accepted by the Engineer

(Cement: CEMII/A-M)

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

cleaning and racking out joints,

finishing with flush pointing with cement sand (F

washing and screening of sand (F

electricity and other charges complete and standard practice accepted by the Engineer

cleaning and racking out joints,

finishing with flush pointing with cement sand (F

washing and screening of sand (F

electricity and other charges etc

all complete and accepted by the Engineer

washing and screening of sand of F

electricity and other charges etc

all complete and accepted by the Engineer

Cement: CEM-II/A-M)

best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F

laying the concrete in alternate panels,

compacting and finishing the top with neat cement and curing at least 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M)In ground floor

best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F

laying the concrete in alternate panels,

compacting and finishing the top with neat cement and curing at least 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F

laying the concrete in alternate panels,

compacting and finishing the top with neat cement and curing at least 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F

laying the concrete in alternate panels,

compacting and finishing the top with neat cement and curing at least 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

Cement: (CEM-II/A-M) In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F

laying the concrete in alternate panels,

compacting and finishing the top with neat cement and curing at least 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M) In ground floor

best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F

laying the concrete in alternate panels,

compacting and finishing the top with neat cement and curing at least 7 days in all floors including cost of water,

electricity and other charges etc

all complete and accepted by the Engineer

(Cement: CEM-II/A-M)In ground floor

Extra cost shall be incorporated in the estimate for each additional floor for patent stone works

Add for each additional floor up to 5th floor

Add for each additional floor from 6th floor to 9th floor

Add for each additional floor for 10th floor and above

END OF DIVISION FOUR …………………

Unit Rate

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

Unit Rate

DIVISION 05 : MOSAIC WORKS Item No

Description of Item

and laying the same over minimum 25 mm thick artificial patent stone flooring with brick chips (1:2:4) including making suitable panel,

washing mosaic chips and supply of all necessary materials and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips In Ground Floor

With Indian In ground floor

With Pakistani In ground floor

With Indian chips and without glass strip using 100% white cement

In ground floor

With Indian chips and without glass strip using 100% grey cement

In ground floor

With Pakistani chips and without glass strip using 100% white cement

In ground floor

washing mosaic chips and supply of all necessary materials and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips and glass strip

In ground floor

With Pakistani chips and glass strip

In ground floor

With Indian chips and without glass strip

In ground floor

With Pakistani chips and without glass strip

In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel,

washing mosaic chips and supply of all necessary materials including and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips and with glass strip

In ground floor

With Pakistani chips and with glass strip

In ground floor

With Indian chips and without glass strip

In ground floor

With Pakistani chips and without glass strip

In ground floor

preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brickchips (1:2:4) including making suitable panels,

washing mosaic chips and supply of all necessary materials and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips and with glass strip

In ground floor

With Pakistani chips and with glass strip

In ground floor

With Indian chips and without glass strip

In ground floor

With Pakistani chips and without glass strip

In ground floor

electricity and other charges in all respect accepted by the Engineer

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

With Indian chips

In ground floor

With Pakistani chips

In ground floor

dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix

and laying the same on 12 mm thick cement plaster (1:4) to wall,

No 120) including finishing the corners and edges and also finishing with Minar stone and supplying all necessary materials in and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips

In ground floor

With Pakistani chips

In ground floor

With Indian chips using 100% grey cement

In ground floor

dust free and properly washed marble chips and one part of mixture containing white and grey cement in proportion (1:9) and necessary quantity of approved colouring materials including preparation of mix and laying the same over min 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel,

washing mosaic chips and supply of all necessary materials in all respects and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips and with glass strip

In ground floor

With Pakistani chips and with glass strip

In ground floor

With Indian chips and without glass strip

In ground floor

With Pakistani chips and without glass strip

In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) and necessary quantity of approved colourings materials including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panel,

washing mosaic chips and supply of all necessary materials in all respects and water,

electricity and other charges in all respect accepted by the Engineer

With Indian chips and with glass strip

In ground floor

With Pakistani chips and with glass strip

In ground floor

With Indian chips and without glass strip

In ground floor

With Pakistani chips and without glass strip

In ground floor

dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) and necessary quantity of approved colouring materials including preparation of mix and laying the same on 12 mm thick cement sand (F

electricity and other charges complete in all respect accepted by the Engineer

With Indian chips

In ground floor

With Pakistani chips

In ground floor

electricity and other charges complete in all respect accepted by the Engineer and preparation of mix machine pressed on 12 mm thick cement sand (F

2 and 2

setting the tiles on 40 mm thick cement sand (F

2 and 2

washing mosaic chips and supply of all necessary materials etc

electricity and other charges complete in all respect accepted by the Engineer

(Cement: CEM-II/AM)

In ground floor

PWD SoR 2014 for Civil Works

Item No

Description of Item

In ground floor

Extra cost shall be incorporated in the estimate for mosaic and terrazzo tiles work above ground floor (item No

Add for each additional floor up to 5 th floor

Add for each additional floor for 6th to 9th floor

Add for each additional floor for 10th floor and above

END OF DIVISION FIVE …………………

Unit Rate

PWD SoR 2014 for Civil Works

Item No

Description of Item

Unit Rate

DIVISION 06 : GLAZED TILES AND MARBLE STONE WORK Item